They started the backsplash in the kitchen:
They installed the dishwasher, sink, faucet, oven and microwave:
The wood mantel was installed, but looks like it still needs to be sanded and stained:
The toilets have all been installed. Here is the downstairs guest bathroom - they also installed the cool counter/sink in this one:
They installed all the sink/shower and door hardware throughout the house.
.
They also started the patio out back:
No comments:
Post a Comment